ASTM A53 GR B Seamless Pipe Production and Processing
The production process of ASTM A53 GR B seamless steel pipe includes billet piercing, rolling, and diameter expansion. Among them, hot rolling is one of the main production methods. The steel pipe is formed and reaches the required size and performance requirements through high-temperature rolling. In addition, cold drawing, hot expansion and other processing methods can be performed as needed to further improve the performance and precision of the steel pipe.